Product Lab

Your concept in,
then the plan.

Partly runs: the eight steps, the product plan, its check and the build package run today. Concept In and Product Scope are built and not yet switched on, and the live-and-wired check is not built yet.

01The steps

The same steps,
in its own words.

Step names are the product's own labels. Steps five and six are the ones you approve.

The grammar is the same in every workstream. The words differ because the work differs.

Build · steps 1–4

  1. 1Concept InBring in your concept
  2. 2Product ScopeDraw the first version
  3. 3Product PlanDesign the product
  4. 4Plan RefinementSharpen the plan

Approve and run · steps 5–8

  1. 5Plan CheckCheck it, then freeze it
  2. 6Build HandoverHand it to the build
  3. 7Live & WiredIntegrate and prove it
  4. 8Product LearningCapture what it taught

02What you buy

What you buy is the work
done in steps one to four.

Each step ends in something you hold.

  1. 01
    Concept InBring in your concept
    The concept you chose, or your own product brief, read into one clear record.
  2. 02
    Product ScopeDraw the first version
    What the first version does, what waits for later, and the one number that says it worked.
  3. 03
    Product PlanDesign the product
    The whole plan is written in one pass — what it does, who it is for, how it is built.
  4. 04
    Plan RefinementSharpen the plan
    You say what to change in your own words.

At step five, Plan Check, you check the work and approve it before anything is used.

03The step page

See how simple
the step page is.

One step, one page: what it needs from you, what it produces, and what comes next.

Previews use the real step names, the new workstream names and neutral sample data.

Product Lab
  1. 1Concept In
  2. 2Product Scope
  3. 3Product Plan
  4. 4Plan Refinement
  5. 5Plan Check
  6. 6Build Handover
  7. 7Live & Wired
  8. 8Product Learning

Design the product

Design preview · in build Sample data · Product Lab, or a preview

04Instead of

One workstream instead of
a product manager.

Today's wayWith Product Lab
A build budget, seats in tools like Figma or Notion, and the weeks between the brief and anything shipping.Built for: It takes in your concept, draws the first version and writes the plan your builders work from, checked before anything is spent.

How it is measured on your numbers: Weeks from brief to an agreed plan, and how much of the plan is redone, before and after.

Thirty minutes with a founder.

Find your top growth priorities and see whether Exponic fits.

Next workstream: Campaign Studio